Pipeline Network & Transportation

High-capacity crude transmission, supercritical CO2 EOR pipelines, and closed-loop gathering systems engineered for flow assurance across the Permian Basin and Gulf Coast corridors.

Pipeline Grid Length

480+ Miles

Crude, Gas, CO2 & Water Lines

Throughput Capacity

285k bpd

Aggregate system peak capacity

Operational Reliability

99.94%

3-year rolling uptime index

SCADA Telemetry

100%

Real-time acoustic & pressure monitoring

Integrated Transportation Architecture

Celero Energy’s pipeline infrastructure forms the operational backbone connecting our upstream producing fields in Winkler, Ward, Andrews, and Ector counties with key regional refining headers and Gulf Coast export outlets. Engineered for long-term flow assurance and zero avoidable downtime, our network safely moves crude oil, dry natural gas, high-pressure carbon dioxide, and recycled produced water.

Our multi-office operational model couples on-the-ground technical pipeline maintenance based out of our Midland Operating HQ with pipeline dispatch and Gulf Coast logistics management supported by our Covington Regional Operations Office.

Cross-Basin Strategic Positioning

Strategically routing crude to the Crane Hub and Midland Terminal provides direct physical connectivity into major long-haul interstate carriers, guaranteeing low-cost offtake to Gulf Coast refining centers in Houston, Beaumont, and Corpus Christi.

Core Pipeline Arteries

  • Midland-to-Crane Crude Header

    24-inch high-pressure steel transmission artery moving segregated WTI sweet crude directly to long-haul carrier interconnects.

  • 18.1-Mile Proprietary CO2 EOR Trunkline

    Supercritical phase carbon dioxide delivery pipeline sustaining reservoir pressure maintenance across San Andres and Grayburg formations.

  • Delaware Basin Gas Gathering Trunk

    Multi-wellhead low-and-medium pressure gathering network feeding cryogenic processing and NGL recovery facilities.

  • Closed-Loop Produced Water Network

    12-inch heavy-duty HDPE piping delivering produced fluids to centralized water recycling impoundments, recycling >98% of field water.

Pipeline Integrity & Safety Engineering

Celero Energy operates under rigorous integrity standards adhering to DOT PHMSA (Pipeline and Hazardous Materials Safety Administration) 49 CFR Part 195 regulations and Texas Railroad Commission Rule 8. Safety, leak prevention, and cathodic protection are monitored continuously around the clock.

⚙️

Smart Pigging & In-Line Inspection

Routine deployment of high-resolution Magnetic Flux Leakage (MFL) and ultrasonic geometric deformation pigs allows sub-millimeter pipe-wall measurement, identifying internal or external corrosion before metal loss becomes critical.

📡

SCADA Acoustic & Mass Balance

State-of-the-art supervisory control and data acquisition (SCADA) systems compare incoming and outgoing flow meters every 2 seconds. Any discrepancy over 0.05% triggers automated alarm sequences and immediate valve isolation.

🛡️

Cathodic Protection & Coating

Fusion Bonded Epoxy (FBE) exterior coatings combined with impressed current cathodic protection (ICCP) ground beds maintain optimal negative pipe-to-soil potential across 100% of buried steel trunklines.

Pipeline Segments & Delivery Hubs

Browse active pipeline segments, nominal diameters, operating pressures, and primary terminal interconnects.

Segment Name ⇅ Product ⇅ County / Region ⇅ Diameter ⇅ MOP (psig) ⇅ Interconnect Hub ⇅ Status ⇅
Midland Mainline Trunk Crude Oil (WTI Sweet) Midland / Ector 24" Steel 1,440 psig Midland Terminal Hub ● Active Operational
Crane Express Header Crude Oil (WTI Sweet) Crane / Upton 20" Steel 1,440 psig Crane Long-Haul Hub ● Active Operational
EOR Supercritical CO2 Line CO2 (Supercritical) Winkler / Ward 12" Heavy Wall 2,100 psig McCamey EOR Header ● Active Operational
Winkler Rich Gas Lateral Natural Gas & NGL Winkler County 16" Steel 900 psig Waha Cryogenic Gate ● Active Operational
Ward County Gas Gathering Casinghead Gas Ward County 12" Dual Pipe 720 psig Pyote Central Plant ● Active Operational
Andrews South Gathering Crude Oil (Blend) Andrews County 10" Steel 1,100 psig Goldsmith Station ● Active Operational
Produced Water Loop A Recycled Water Winkler / Ward 16" HDPE / SDR-9 250 psig Permian Recycling Facility 1 ● Active Operational
Produced Water Loop B Recycled Water Andrews / Ector 12" HDPE / SDR-11 200 psig Subsurface Treatment 3 ● Active Operational
Wink Feeder Line Extension Crude Oil Winkler County 16" Steel 1,250 psig Wink Terminal Offtake ● Scheduled Tie-In

Shipper Services & Flow Allocation

Third-party producers and working interest partners seeking pipeline connection, capacity reservation, or custody transfer nominations can reach our commercial dispatch and operations scheduling teams directly.

  • ✓ Monthly nomination deadlines adhering to industry standard Texas RRC cycles
  • ✓ Rigorous LACT calibration with automatic temperature & BS&W compensation
  • ✓ Batch ticketing and real-time electronic data interchange (EDI) statements
Submit Connection Request Call Dispatch: +1 (432) 695-4878

Operations Coordination

Our pipeline system is actively coordinated across our Texas and Louisiana operational command centers:

Operating HQ (Midland, TX) 400 W Illinois Ste 1300, Midland, TX 79701
Field maintenance, pigging runs, and wellhead tie-ins