Pipeline Grid Length
480+ Miles
Crude, Gas, CO2 & Water LinesThroughput Capacity
285k bpd
Aggregate system peak capacityOperational Reliability
99.94%
3-year rolling uptime indexSCADA Telemetry
100%
Real-time acoustic & pressure monitoringIntegrated Transportation Architecture
Celero Energy’s pipeline infrastructure forms the operational backbone connecting our upstream producing fields in Winkler, Ward, Andrews, and Ector counties with key regional refining headers and Gulf Coast export outlets. Engineered for long-term flow assurance and zero avoidable downtime, our network safely moves crude oil, dry natural gas, high-pressure carbon dioxide, and recycled produced water.
Our multi-office operational model couples on-the-ground technical pipeline maintenance based out of our Midland Operating HQ with pipeline dispatch and Gulf Coast logistics management supported by our Covington Regional Operations Office.
Cross-Basin Strategic Positioning
Strategically routing crude to the Crane Hub and Midland Terminal provides direct physical connectivity into major long-haul interstate carriers, guaranteeing low-cost offtake to Gulf Coast refining centers in Houston, Beaumont, and Corpus Christi.
Core Pipeline Arteries
-
Midland-to-Crane Crude Header
24-inch high-pressure steel transmission artery moving segregated WTI sweet crude directly to long-haul carrier interconnects.
-
18.1-Mile Proprietary CO2 EOR Trunkline
Supercritical phase carbon dioxide delivery pipeline sustaining reservoir pressure maintenance across San Andres and Grayburg formations.
-
Delaware Basin Gas Gathering Trunk
Multi-wellhead low-and-medium pressure gathering network feeding cryogenic processing and NGL recovery facilities.
-
Closed-Loop Produced Water Network
12-inch heavy-duty HDPE piping delivering produced fluids to centralized water recycling impoundments, recycling >98% of field water.
Pipeline Integrity & Safety Engineering
Celero Energy operates under rigorous integrity standards adhering to DOT PHMSA (Pipeline and Hazardous Materials Safety Administration) 49 CFR Part 195 regulations and Texas Railroad Commission Rule 8. Safety, leak prevention, and cathodic protection are monitored continuously around the clock.
Smart Pigging & In-Line Inspection
Routine deployment of high-resolution Magnetic Flux Leakage (MFL) and ultrasonic geometric deformation pigs allows sub-millimeter pipe-wall measurement, identifying internal or external corrosion before metal loss becomes critical.
SCADA Acoustic & Mass Balance
State-of-the-art supervisory control and data acquisition (SCADA) systems compare incoming and outgoing flow meters every 2 seconds. Any discrepancy over 0.05% triggers automated alarm sequences and immediate valve isolation.
Cathodic Protection & Coating
Fusion Bonded Epoxy (FBE) exterior coatings combined with impressed current cathodic protection (ICCP) ground beds maintain optimal negative pipe-to-soil potential across 100% of buried steel trunklines.
Pipeline Segments & Delivery Hubs
Browse active pipeline segments, nominal diameters, operating pressures, and primary terminal interconnects.
| Segment Name ⇅ | Product ⇅ | County / Region ⇅ | Diameter ⇅ | MOP (psig) ⇅ | Interconnect Hub ⇅ | Status ⇅ |
|---|---|---|---|---|---|---|
| Midland Mainline Trunk | Crude Oil (WTI Sweet) | Midland / Ector | 24" Steel | 1,440 psig | Midland Terminal Hub | ● Active Operational |
| Crane Express Header | Crude Oil (WTI Sweet) | Crane / Upton | 20" Steel | 1,440 psig | Crane Long-Haul Hub | ● Active Operational |
| EOR Supercritical CO2 Line | CO2 (Supercritical) | Winkler / Ward | 12" Heavy Wall | 2,100 psig | McCamey EOR Header | ● Active Operational |
| Winkler Rich Gas Lateral | Natural Gas & NGL | Winkler County | 16" Steel | 900 psig | Waha Cryogenic Gate | ● Active Operational |
| Ward County Gas Gathering | Casinghead Gas | Ward County | 12" Dual Pipe | 720 psig | Pyote Central Plant | ● Active Operational |
| Andrews South Gathering | Crude Oil (Blend) | Andrews County | 10" Steel | 1,100 psig | Goldsmith Station | ● Active Operational |
| Produced Water Loop A | Recycled Water | Winkler / Ward | 16" HDPE / SDR-9 | 250 psig | Permian Recycling Facility 1 | ● Active Operational |
| Produced Water Loop B | Recycled Water | Andrews / Ector | 12" HDPE / SDR-11 | 200 psig | Subsurface Treatment 3 | ● Active Operational |
| Wink Feeder Line Extension | Crude Oil | Winkler County | 16" Steel | 1,250 psig | Wink Terminal Offtake | ● Scheduled Tie-In |
Shipper Services & Flow Allocation
Third-party producers and working interest partners seeking pipeline connection, capacity reservation, or custody transfer nominations can reach our commercial dispatch and operations scheduling teams directly.
- ✓ Monthly nomination deadlines adhering to industry standard Texas RRC cycles
- ✓ Rigorous LACT calibration with automatic temperature & BS&W compensation
- ✓ Batch ticketing and real-time electronic data interchange (EDI) statements
Operations Coordination
Our pipeline system is actively coordinated across our Texas and Louisiana operational command centers:
Field maintenance, pigging runs, and wellhead tie-ins
Regional pipeline logistics, regulatory affairs, and flow scheduling