Permian Basin Upstream Operations

Maximizing primary yields and long-term ultimate recovery through advanced subsurface reservoir characterization, secondary waterflooding, and miscible CO2 injection.

Gross Production

38,500 boepd

74% High-Margin Liquids

Net Mineral Acreage

65,000 Acres

Held by Production (HBP)

Active Wellbores

485+

Producers & EOR Injectors

Reserve Life Index

22.4 Years

Low Corporate Decline Rate

Subsurface Characterization & EOR Excellence

Celero Energy’s upstream engineering mandate focuses on authoritative reservoir management and extending the productive operational life of mature fields. Unlike operators focused exclusively on rapid, high-decline shale fracs, Celero acquires established, long-life assets characterized by immense original oil in place (OOIP) and applies systematic secondary and tertiary Enhanced Oil Recovery (EOR) disciplines.

Our technical teams utilize high-resolution 3D seismic inversion, computerized petrophysical log suites, and automated decline curve analysis (DCA) to uncover unswept pay zones. By executing high-density infill drilling patterns and continuous waterflood voidage replacement, our fields maintain low single-digit base decline rates with high cumulative free cash flow margins.

Voidage Replacement Ratio (VRR) Target

Our reservoir engineers maintain a tight 1.05 to 1.12 VRR across all waterflood units, ensuring reservoir pore pressure remains above bubble point pressure to eliminate free-gas breakout and maximize oil mobility toward producing wells.

Core Geological Target Formations

San Andres Dolomite (2,800' – 4,500')

Prolific shelf carbonate with intercrystalline porosity (10–18%). Ideal target for five-spot pattern waterflooding and long-term secondary displacement.

Grayburg Formation (3,600' – 4,800')

Interbedded dolomites and sandstones with high residual oil saturation. Highly responsive to miscible supercritical CO2 displacement.

Yates Sandstone (2,200' – 3,200')

Shallow, highly permeable (50–300 mD) reservoir providing predictable, low-lifting-cost baseload crude production across Ward and Winkler counties.

Devonian & Fusselman Silurian (7,800' – 10,200')

Deeper structural fault blocks producing premium, light sweet crude (41°–44° API) with substantial natural gas energy and high initial well deliverability.

Enhanced Oil Recovery (EOR) Lifecycle

How Celero systematically unlocks additional recovery factors from mature reservoirs, moving from primary pressure depletion to advanced closed-loop CO2 and produced-water recycling.

1️⃣

Primary Depletion & Audit

Detailed well-log digitization, downhole camera inspection, fluid-level sonic soundings, and casing integrity tests to identify unperforated pay horizons and mechanical re-entry candidates.

2️⃣

Waterflood Pressurization

Conversion of depleted wells to high-pressure water injectors. Injection of treated, closed-loop recycled water to re-energize formation pressures and drive oil banks directly toward producers.

3️⃣

Supercritical CO2 Injection

Injection of high-density CO2 through our 18.1-mile proprietary pipeline. Under reservoir conditions, CO2 reaches miscibility with crude, swelling the oil and lowering viscosity to release trapped hydrocarbons.

Field Development Case Studies

Proven engineering execution and tangible production turnarounds across core Permian Basin assets.

North Ward Estes Field Optimization

Ward & Winkler Counties, TX

Celero re-evaluated historical Yates and Seven Rivers waterflood patterns, replaced worn downhole tubing, and installed variable-frequency drive (VFD) electric submersible pumps (ESPs).

Results: +285% net oil production increase within 18 months while cutting lifting costs per barrel by 34%.

South Cowden Grayburg CO2 Flood

Ector County, TX

Implemented high-pressure CO2 WAG (Water-Alternating-Gas) displacement across 32 continuous patterns, supported by SCADA injection monitoring and acoustic leak detection.

Results: Estimated ultimate recovery (EUR) expanded by 4.8 million boe; project NPV10 increased by $62M.

Devonian Deep Recompletion Program

Andrews County, TX

Deep coiled-tubing cleanouts and targeted acid stimulations in bypassed carbonate zones, tied directly into zero-flare natural gas capture headers.

Results: Brought 14 dormant wellbores back online at an average initial production rate of 165 bopd of premium 41.5° API crude.

Leases Operated by Celero Energy, L.P.

Comprehensive Texas Railroad Commission (RRC) registered lease inventory across core Permian Basin counties.

Lease No ⇅ Lease Name ⇅ County ⇅ Formation ⇅ Depth (ft) ⇅ API Gravity ⇅ Recovery Method ⇅ Status ⇅
08-01332BROWN-ALTMAN -C-Winkler CountySan Andres3,450'36.2°Waterflood SecondaryActive
08-033358ESTES, W. A.Ward CountyYates2,820'34.0°Waterflood SecondaryActive
08-14665UNIVERSITY -F-Andrews CountyGrayburg4,200'38.5°CO2 Miscible FloodActive
08-34065COLE RANCHEctor CountyDevonian8,650'41.1°Primary Gas LiftActive
08-22625NELSON UNITAndrews CountyWichita-Albany5,400'37.8°Waterflood PatternActive
08-11221SMITH LEASECrane CountySan Andres3,120'35.5°Waterflood PatternActive
08-44552JOHNSON TRACTUpton CountyWolfcamp9,200'42.0°Artificial Lift ESPMaintenance
08-18942HENDRICK LEASE -B-Winkler CountyYates Sand2,650'33.8°Rod Pumping SecondaryActive
08-20411FOSTER FIELD UNITEctor CountyGrayburg4,150'37.4°CO2 Injection WAGActive
08-27890NORTH WARD UNIT 12Ward CountyQueen Sand2,950'34.5°Waterflood InfillActive
08-31102MCELROY TRACT -D-Crane CountyGrayburg Dolomite3,800'36.9°Secondary RecoveryActive
08-15509UNIVERSITY CONSOLIDATEDAndrews CountySan Andres4,420'38.1°Waterflood PatternActive
08-42218HALLEY UNITWinkler CountyClearfork6,100'39.2°Beam Pumping SecondaryActive
08-39045PECOS RIVER TRACTWard CountyYates2,700'34.2°Waterflood SecondaryActive
08-48912MIDLAND BASIN ROYALTYMidland CountyDevonian9,450'42.5°Deep ESP ProductionActive
08-51204MONAHANS SOUTHWard CountyGlorieta5,200'38.0°Secondary RecompletionWorkover
08-33291GOLDSMITH SHALLOWEctor CountySan Andres3,950'36.8°Waterflood InfillActive
08-47781KERMIT WEST UNITWinkler CountyYates Sand2,850'33.9°Waterflood PatternActive
08-53310SHAFTER LAKE EXTENSIONAndrews CountyClearfork6,400'39.7°Primary Gas LiftActive
08-56740SAND HILLS UNITCrane CountyDevonian Chert8,100'41.8°High-Pressure ESPActive

Integrated Transportation & Midstream Grid

All upstream production is routed directly through Celero's dedicated 480+ mile gathering and pipeline network, ensuring zero downtime and direct custody transfer to high-margin Gulf Coast markets.

View Pipeline Network Explore Midstream Facilities